Full-vacuum chlorinator CEM11 for simultaneous delivery from cylinders in battery operation, includes the following:
- Integrated chlorine gas filter
- Pressure gauge -1…0…15 bar with diaphragm pressure separator
- Residual Pressure Preservation with vacuum cutoff
- Vacuum regulation with simultaneous delivery for battery operation
- Flow limiter (if needed)
Connections :
- Chlorine cylinder connection : Union nut (yoke connection is also available)
- Vacuum connections PE hose 8/12
Available Chlorine cylinder connections: 1", G 5/8, G3/4